A new drawing revision needs its own approved checks before any unit made to it can be inspected. The starter rule Inspect a drawing revision with its own checks adds a family and drawing binding: units of the family you choose, made to the drawing revision you choose, get the approved checks you pick as their base checks.
Use the starter rule
You need the Author role. The cards belong to one plan, because their blanks are that plan's own declared context values and approved checks, so the plan needs a saved draft first. What the card adds goes into the next draft revision: inspections already started keep the plan they started with, and new units keep following the active release until a Reviewer activates a new one.
- Open Plans and releases and find the plan.
- Open Start from a starter rule in that plan. It is already open where the site has only one plan. Under Starter rules, find Inspect a drawing revision with its own checks, in Drawing revisions, or type a word from its title in Search starter rules and Help.
- Fill in the blanks in the card's sentence, "Inspect family … units made to drawing revision … for ….":
- Family: one of the plan's declared families.
- Drawing revision: one of the plan's declared drawing revisions. Declare a new revision under 1. Supported context in Edit draft first. The card is offered only while some declared family and revision have no binding.
- Approved checks: one or more of the plan's approved checks, at least one of them a measured, pass or fail, or choice check. They are saved in the plan's own order.
- Choose Use this rule. The button waits until every blank has a value.
CheckStation saves the next draft revision with the binding added under 3. Family and drawing bindings, named after the family and drawing revision, with the checks you picked as its base checks and Supervisor must release left unticked. It is exactly what typing the same binding in Edit draft and choosing Save draft would save, and you are recorded as the author of that draft, so another Reviewer must approve it. No AI is asked, and nothing is proved, approved or activated. The plan then says what was added and what to do next.
Where describing a rule condition in plain English is available for your site, the card also offers Reword with AI. On this card it adds nothing and says why: a family and drawing binding has no condition to describe. Where it is not available, which includes the sample workspace, the card offers Use this rule alone.
Where SmartFACT Automation is connected to CheckStation, you can also arrive here from New requirement there, which offers the cards of the plan whose draft was saved most recently. Its Use this rule makes nothing: it opens that plan's page with this card alone and its blanks filled in, and the page names the plan. Check the plan and the blanks, then choose Use this rule on the page. See every starter rule shows all the plan's cards. If you were signed out, signing in brings you back to the card, also after choosing an organisation.
What the binding does
At selection, a unit of that family made to that drawing revision is inspected against those base checks, with their approved methods and limits, and the plan's rules still add their checks and releases. A unit on a drawing revision that no binding covers cannot start inspection, rather than being inspected against another revision. If every result should also wait for a Supervisor, tick Supervisor must release on the binding in Edit draft.
In the Bracket assembly BR-200 final inspection plan, "Inspect family A units made to drawing revision B2 for Hole diameter, family A (hole-a-v1), Visual finish (finish-v1)." gives units of family A on drawing revision B2 those two checks. Activation is refused while another active plan already binds the same family and drawing revision.
Prove the draft
A starter rule writes no proof example. Each example's expected checks, evidence and supervisor release are yours to state from the approved method, and CheckStation never works them out for you.
Open Review frozen draft and proof and choose Run proof examples. The proof lists the new binding under uncovered bindings, and every context of the new family and drawing revision under uncovered contexts. Add a proof example for each of them under 5. Proof examples in Edit draft, stating the base checks the approved method gives and any check, evidence or release the plan's rules add, then save the draft and run the proof again until it passes. Then a Reviewer who has not saved a draft of this plan reviews and activates it, as proof and approval describes.
Change it later
Nothing about a starter rule makes its binding permanent. In Edit draft, under 3. Family and drawing bindings, change or remove it like any other, or use another card. Save the draft, prove it and have it reviewed in the same way. Inspections already started keep the plan they started with.
If the card is refused
- This draft already binds that family and drawing revision. Change that binding's base checks in Edit draft instead.
- A binding needs at least one measured, pass or fail, or choice check. Pick at least one check that is not evidence or an instruction.
- This starter rule has changed since the page was loaded. CheckStation has a newer version of the card. Refresh the page and fill it in again.
- The record changed after this page was loaded. Someone saved the draft after you opened the page. Refresh it, check what changed, then use the card again.
- A blank on the card is not one of this plan's values or approved checks. The plan changed under the card. Refresh the page and fill it in again.