Owner access supports site administration, readiness, plan and recovery decisions. It does not grant engineering authoring, candidate approval or configuration acceptance. If you undertake one of those responsibilities, obtain the corresponding product role through your organisation's access arrangements.
Establish readiness and responsibility
Open Site readiness and inspect the current workspace and recorded readiness evidence. Confirm the organisation, site and intended evaluation use. FactorySpec results in this release are not approved for manufacture. A reachable workspace or passing controlled example does not qualify a customer's engineering family.
Arrange an Author to prepare the model, an independent Reviewer to approve and activate it, and a Supervisor to evaluate unit inputs and accept results. Plan who will investigate dependency withdrawals and communicate with recipients of earlier engineering packs.
Use Plan and usage and Service health for administrative questions. Keep sign-ins attributable to the real person. Do not share a reviewer's identity to make an engineering decision available from an owner account.
Preserve a checked exit archive
Site readiness includes Private exit archive. Request an archive, build the recorded request, wait for its ready state and download it privately. Verify the SHA-256 of the downloaded file before acknowledging it. A build answer is not a completed archive download.
Only acknowledge a file you actually checked. Closure refers to the acknowledged archive and current obligations. Preserve it securely because it contains engineering records and their evidence.
Recover or close deliberately
After a restore, Supervisors reconcile affected results and an Owner completes the recovery review of its evidence. Follow the displayed process and its exact evidence hash. Reopening administration does not turn an engineering hold into a manufacturing approval.
Before pausing or permanently closing the site, inspect open work and the selected archive. Read the stated consequence and give the operational reason. Follow Archives, restore and closure. Retain the separation between administrative readiness, reviewed engineering releases and actual physical manufacture when explaining the site's status.
Continue with Site readiness and support for site creation, administrative readiness, Activity and the private diagnostic.