Skip to content
SmartFACT HelpHandbooksWatch and practise
Handbooks: SmartFACT Automation

Review and adopt a plain-English proposal

Check provider disclosure, exact source basis, proposed meaning and limits before a separate draft adoption.

Review edition · 25 October 2026 · For Author

On this page

Assisted authoring can prepare a proposed rule or plan from a controlled source context when the feature is available and authorised. Its output is a proposal to inspect. It does not approve a release or decide live production work.

Prepare a precise request

Start with the intended product, source revision and complete saved basis. Describe the condition using the product's supported facts and exact units or values. Keep the intended outcome and engineering source clear. Missing facts should remain questions rather than being guessed to complete the sentence.

Read the panel's disclosure of provider, data sent and applicable allowance or spending limits before requesting a proposal. Unavailable or refused authoring should leave the task in its ordinary structured workflow. Repeated requests are not a substitute for resolving a missing permission or source requirement.

Inspect the proposed meaning

Read the condition preview and complete proposed changes. Compare them with the original requirement and source context. Check boundary comparisons, missing-information handling, exact code choices and any unchanged engineering values.

A convincing sentence is not evidence that the typed rule says the same thing. Inspect the structured interpretation and product differences. Where a response requests clarification or cannot safely express the instruction, resolve it before adoption rather than inventing a compatible meaning.

Adopt separately and prove independently

Use the explicit adoption control only for the checked current proposal. Adoption records a draft change; independent cases, proof, native and central review and activation remain separate. Contributors remain attributable after adoption.

Keep an uncertain request's original identity and use the available outcome check. Do not start another paid attempt merely because an answer was interrupted. Current financial and authority gates can refuse a new call even when a previous plan was saved.

Approved production runs locally and deterministically without asking a model to decide each event. Follow Write independent expected cases to challenge the adopted draft against answers established from the process source.