Handle an incomplete-work refusal
See why an unchecked unit cannot be recorded as despatched.
For operators
Sam Ashworth is signed in at Hartwell & Pryce Engineering's Brighouse works with only the Operator role. Approved rules, a prepared source file and an issued two-unit order are already present. Every screen and answer comes from OrderRun itself.
Read these instructions on any device. Watch or practise a chapter on a desktop or laptop, with a desktop or mobile application layout. Demonstrations use sample data and simulated scanners.
Handle an incomplete-work refusal
- Choose the floor menu
Choose the floor menu.
Use the floor menu for your station and physical work.
- Open Workstation
Open Workstation.
The office has issued this work. Find the station assigned to you.
- Take control of your station
Take control of your station.
Take control before reporting work. This prevents another sign-in from using the same station at once.
- Get ready to scan
Get ready to scan.
Select the scan box. Scanning finds the work but does not record completion.
- Scan the order
Scan the order.
Read the order reference and check that the work shown matches the item in front of you.
- Select the exact departing unit
Select the exact departing unit.
Select the first unit. Its production and inspection checks are not complete yet.
- Confirm the physical departure statement
Confirm the physical departure statement.
Confirm this only after the selected item has physically left. Even then, incomplete checks prevent recording.
- Enter the despatch reference
Enter the despatch reference.
A reference cannot override missing checks.
- Read the refusal and stop
Read the refusal and stop.
The server refuses this incomplete work. Do not repeat the action to bypass the checks. Ask a Supervisor to inspect the missing evidence.
Keep accepted orders, issued packs, reviewed reports and physical departure separate. Following a guide is not permission to release customer work. Ask a Supervisor about a hold or unclear result.