Check readiness before inviting users
Read the readiness failures and see what evidence is still needed.
For owners
This lesson uses frame assembly FA-300 at Brighouse works and a person with only the owner role. No result here is approved for manufacture.
Read these instructions on any device. Watch or practise a chapter on a desktop or laptop, with a desktop or mobile application layout. Demonstrations use sample data and simulated scanners.
Check readiness before inviting users
- Site readiness
Site readiness.
Open site readiness.
- Read the invitation gates
Read the invitation gates.
An Owner checks hosted sign-in, backup, malware scanning and onboarding evidence. Ownership does not grant engineering approval. Brighouse works does not pass production readiness yet.
Check the current record and your own authority before you act on a result. An evaluation result never authorises manufacture.