Observe actual cycles and nested interruptions

Use genuine advancing clocks and explicit taps; interruptions remain inside gross cycle time.

For operators

Read these instructions on any device. Watch or practise a chapter on a desktop or laptop, with a desktop or mobile application layout. Demonstrations use sample data and simulated scanners.

Observe actual cycles and nested interruptions

  1. Start a local timing study

    Start a local timing study.

    This lesson times your real practice taps with the browser clocks. It never measures a machine or validates a labour standard.

  2. Capture the exact station code

    Capture the exact station code.

    000017 is declared context. Scanning a station never starts the clock or operates a machine.

  3. Describe the observed activity

    Describe the observed activity.

    The activity is the observer’s description. It does not identify an employee or determine performance.

  4. Move to the timing controls

    Move to the timing controls.

    The clock is still stopped. Use explicit taps to mark boundaries while keeping this page visible.

  5. Start the real practice interval

    Start the real practice interval.

    The browser’s steady clock begins now. The displayed precision does not remove human reaction delay.

  6. Record the next cycle boundary

    Record the next cycle boundary.

    This tap ends the first observed gross cycle and starts the next. The duration comes from the genuine browser clock.

  7. Name the observed interruption

    Name the observed interruption.

    Describe the interruption before starting it. It will remain inside this cycle’s gross time.

  8. Start an interruption within the cycle

    Start an interruption within the cycle.

    The cycle keeps running. Next and Finish are unavailable until the interruption ends; its time must never be added to or subtracted from gross.

  9. End the nested interruption

    End the nested interruption.

    The genuine timer records the interruption inside the unfinished cycle. It does not create another cycle.

  10. Finish and review both cycles

    Finish and review both cycles.

    The final tap ends cycle two and opens the actual results. Review the recorded gross times and nested interruption.

Watch or practise this chapter

Contact SmartFACT support · Explore the suite