Handle a stale working copy
Refuse a proposal when another maintainer has already saved a newer version.
For operators
Use an authorised SmartFACT account. This desktop guide follows the complimentary invited pilot. Background connections and Google Sheets synchronisation are outside its scope.
Read these instructions on any device. Watch or practise a chapter on a desktop or laptop, with a desktop or mobile application layout. Demonstrations use sample data and simulated scanners.
Handle a stale working copy
- Open reference tables
Open reference tables.
This uses a separate table, the customer code cross-reference, so the shared customer product assignments stay unchanged.
- Open the customer code cross-reference
Open the customer code cross-reference.
This page shows version one. Meanwhile another maintainer saves a separate, reviewed correction, leaving this screen with the old revision.
- Draft a change in the older page
Draft a change in the older page.
The draft still refers to version one. Another maintainer has saved version two since the page was read.
- Review the stale proposal
Review the stale proposal.
The server refuses the stale revision. Keep the draft, compare the current saved table in another tab, then reload and review a fresh proposal. Do not force an overwrite.
Keep receiving-product review and activation separate from saving or exporting reference data.