# Review the overdue priority release

Reopen the submitted configuration with its overdue priority rule, read its proof and record an independent decision.

Source: https://help.smartfact.ai/automation/guides/tooltrack-assisted-release-review

Audience: Reviewer

Reopen the submitted configuration with its overdue priority rule, read its proof and record an independent decision.

## Independent release review

1. **Load the current ToolCustody draft**

   Load the current ToolCustody draft

   Load the submitted configuration with the overdue priority rule.

2. **Open the saved submission**

   Open the saved submission

   Load the saved submission and read its proof from ToolCustody again. Loading it does not approve it.

3. **Read the proof result**

   Read the proof result

   Read the retained proof: every expected result passed, including high priority from 120 minutes overdue.

4. **Explain the independent release decision**

   Explain the independent release decision

   Record how you checked the whole configuration, the overdue priority rule, its expected results and the proof.

5. **Record the independent release review**

   Record the independent release review

   Approve this exact release only after reviewing its evidence. Activation remains a separate action.

[Watch or practise this chapter](https://help.smartfact.ai/automation/demo?guide=tooltrack-assisted-release-review&chapter=assisted-rule&audience=office)

The review is retained by ToolCustody. Activation remains a separate action.
