Review RefillFlow expected results

Review which queue receives a request and when it is due. The check uses the saved working calendar, not an estimate made during review. Check the independently supplied queue and working-calendar results before approving them.

For reviewers

Review which queue receives a request and when it is due. The check uses the saved working calendar, not an estimate made during review. Check the independently supplied queue and working-calendar results before approving them.

Read these instructions on any device. Watch or practise a chapter on a desktop or laptop, with a desktop or mobile application layout. Demonstrations use sample data and simulated scanners.

Review RefillFlow expected results

  1. Load the current RefillFlow source

    Load the current RefillFlow source

    Read the original source and its saved expected results before continuing.

  2. Open the prepared RefillFlow candidate

    Open the prepared RefillFlow candidate

    Open the frozen candidate from the original recorded request. Its revision is separate from the editable draft.

  3. Explain the independent result check

    Explain the independent result check

    Record how you checked the complete queue and working-calendar results against the approved requirement.

  4. Approve the expected queue and working-calendar results

    Approve the expected queue and working-calendar results

    Save the independent check of these expected results. This does not activate the policy.

Watch or practise this chapter

The case review stays with RefillFlow. The whole release still needs its separate proof and release decision.

Contact SmartFACT support · Explore the suite