Describe a RefillFlow routing rule in plain English

Type a replenishment rule in plain English, answer the AI's question about missing details, inspect the complete proposed rule and save it deliberately as a draft.

For authors

Type a replenishment rule in plain English, answer the AI's question about missing details, inspect the complete proposed rule and save it deliberately as a draft.

Read these instructions on any device. Watch or practise a chapter on a desktop or laptop, with a desktop or mobile application layout. Demonstrations use sample data and simulated scanners.

Plain English to a checked draft

  1. Load the current RefillFlow draft

    Load the current RefillFlow draft

    Load the draft replenishment policy from RefillFlow. It routes refills to Main Stores by default and already holds a supervisor alert schedule.

  2. Choose Add routing rule

    Choose Add routing rule

    Choose Add routing rule. The new rule will sit in front of the default route.

  3. Load the routing rule controls

    Load the routing rule controls

    Load the controls for a new routing rule. This reads RefillFlow and does not save anything.

  4. Choose Prepare complete routing rule

    Choose Prepare complete routing rule

    Choose the complete routing rule, so the proposal covers both when the rule applies and where the refill goes.

  5. Type the requirement in plain English

    Type the requirement in plain English

    Type the requirement as the team wrote it: packaging for LINE-2 goes to Packing Stores, due in 60 working minutes, with a supervisor alert after 30 working minutes unaccepted.

  6. Ask for a proposal

    Ask for a proposal

    Ask for a proposal. The AI replies with a question instead of guessing: a new rule needs a name, a precedence, a priority and an urgency approval setting.

  7. Add the details the AI asked for

    Add the details the AI asked for

    Keep the requirement and add the missing details: call the rule Line 2 packaging, give it precedence 10 and routine priority, and do not require separate supervisor approval for urgent requests.

  8. Ask for the complete proposal

    Ask for the complete proposal

    Ask again. The AI now returns a complete routing rule. Nothing is saved until you choose to save it.

  9. Read the restatement of the rule

    Read the restatement of the rule

    Read the restatement. It says in plain words when the rule applies and what it will save: packaging for LINE-2 goes to Packing Stores, routine priority, due after 60 working minutes, with the supervisor alert after 30 working minutes.

  10. Inspect the proposed condition

    Inspect the proposed condition

    Inspect the condition in the same controls RefillFlow uses: the item family is packaging and the receiving location is LINE-2.

  11. Check what will be saved

    Check what will be saved

    Read what the rule will save, field by field. Every value has its name, and Packing Stores and the supervisor alert schedule are shown by name, not by code.

  12. Check the rule name and precedence

    Check the rule name and precedence

    Check the rule is called Line 2 packaging with precedence 10.

  13. Check the queue, due time and alert

    Check Packing Stores, 60 working minutes and the supervisor alert

    Check the outcome: Packing Stores, routine priority, due after 60 working minutes, no separate urgency approval, and the supervisor alert after 30 working minutes.

  14. Confirm you checked the whole proposal

    Confirm you checked the whole proposal

    Confirm that you checked the condition and every value. RefillFlow still validates the whole policy when it saves.

  15. Save the proposal as a draft

    Save the proposal as a draft

    Save the proposal as a draft. Saving does not approve, release or run the rule: expected results, proof and an independent review come next.

Watch or practise this chapter

Only a draft was saved. Expected results, the native proof and an independent review come next.

Contact SmartFACT support · Explore the suite