Prepare a supplied assessment template

Sarah prepares the MOTOR-7 B assessment from an approved saved method, checks the whole proposal and submits it for independent checking.

For authors

Sarah prepares the MOTOR-7 B assessment from an approved saved method, checks the whole proposal and submits it for independent checking.

Read these instructions on any device. Watch or practise a chapter on a desktop or laptop, with a desktop or mobile application layout. Demonstrations use sample data and simulated scanners.

Prepare a supplied assessment template

  1. Load the supplied assessment template

    Load the supplied assessment template

    Load the exact saved MOTOR-CHECK revision 3 method for the MOTOR-7 revision B part in model MODEL-7 revision B. Its engineering values come from the approved method.

  2. Choose the supplied assessment template

    Choose the supplied assessment template

    Choose the source-owned template action. It can prepare its name while retaining every supplied engineering value.

  3. Describe the template to prepare

    Describe the template to prepare

    Ask for the MOTOR-7 B assessment name while keeping MOTOR-CHECK revision 3, its required pass/fail check, evidence requirement and 24-hour validity.

  4. Prepare the template proposal

    Prepare the template proposal

    Read the proposed configuration before saving. A proposal does not approve an engineering method.

  5. Inspect the complete supplied configuration

    Inspect the complete supplied configuration

    Check the name, model and part revisions, approved method, component position, check, evidence requirement and validity. The AI does not invent these engineering inputs.

  6. Check the assessment name

    Check the assessment name

    Check the proposed name is MOTOR-7 B assessment.

  7. Confirm the complete proposal

    Confirm the complete proposal

    Confirm that you checked every supplied value and the proposed template name.

  8. Save the assessment template draft

    Save the assessment template draft

    Save the proposed name with the unchanged supplied method. Saving does not approve the template.

  9. Submit the complete saved method

    Submit the complete saved method

    Submit the complete method, positions, check, evidence requirement and validity. Independent expected values and separate reviews come next.

Watch or practise this chapter

The complete saved template is submitted. No physical assessment or component release has occurred.

Contact SmartFACT support · Explore the suite