Edit OrderRun with manual controls

Set the default order priority to urgent when no routing rule provides another value.

For authors

Set the default order priority to urgent when no routing rule provides another value.

Read these instructions on any device. Watch or practise a chapter on a desktop or laptop, with a desktop or mobile application layout. Demonstrations use sample data and simulated scanners.

Edit OrderRun with manual controls

  1. Load the current OrderRun draft

    Load the current OrderRun draft

    Read the current draft and its independent examples before editing.

  2. Choose the setting to change

    Choose the setting to change

    Select default priority when no rule sets it from the current source choices.

  3. Enter the agreed value

    Enter the agreed value

    Set the default order priority to urgent when no routing rule provides another value.

  4. Prepare the complete draft change

    Prepare the complete draft change

    Prepare the proposed values for this exact source revision. This has not changed the live configuration.

  5. Transfer the prepared change

    Transfer the prepared change

    Transfer the complete change privately to OrderRun. Transfer alone does not save or approve it.

  6. Confirm the complete change

    Confirm the complete change

    Check the complete change and confirm that you intend to save it.

  7. Save the draft revision

    Save the draft revision

    Save the proposed draft. Independent expected results, complete checks and separate review are still required.

Watch or practise this chapter

The new draft is saved. It has not been activated. Enter independent expected results, run the complete checks and obtain a separate review.

Contact SmartFACT support · Explore the suite