Check an interrupted FactorySpec save

Check an interrupted FactorySpec save by reading its original outcome. Keep an uncertain reply separate from a failed change, and do not repeat the save. Work in the practice workspace, with engineering approval kept separate.

For authors

Check an interrupted FactorySpec save by reading its original outcome. Keep an uncertain reply separate from a failed change, and do not repeat the save. Work in the practice workspace, with engineering approval kept separate.

Read these instructions on any device. Watch or practise a chapter on a desktop or laptop, with a desktop or mobile application layout. Demonstrations use sample data and simulated scanners.

Read the original save after an interruption

  1. Load the current FactorySpec configuration

    Read the current product configuration before changing it.

  2. Choose the configuration task

    Choose the source-owned form for the change you need.

  3. Choose the existing entry

    Choose the existing entry rather than creating another rule.

  4. Read the editing controls

    Read the current conditions and permitted values.

  5. Choose the complete change

    Keep the condition and complete action together.

  6. Name the engineering calculation

    Use the drawing reference while retaining the original expression and units.

  7. Prepare the complete change

    Check the complete values before preparing the private file.

  8. Upload the checked file

    Upload the complete change. Uploading alone does not save it.

  9. Confirm the complete change

    Confirm that the whole file contains the values you intend to save.

  10. Recognise an interrupted save reply

    Recognise an interrupted save reply

    The product has saved this change, but its reply is deliberately interrupted in this lesson. Treat the outcome as uncertain and do not save it again.

  11. Read the original saved outcome

    Read the original saved outcome

    Check the recorded request. This reads the original outcome without repeating the save. Continue only after the product confirms the original change.

Watch or practise this chapter

The original saved change is confirmed without another write. Independent expected answers, checking and release approval remain separate.

Contact SmartFACT support · Explore the suite