Enter independent FactorySpec answers

In the practice workspace, enter the expected status and drawing basis for the complete frame calculation. Expected BOM values come from the engineer’s independent calculation.

For authors

In the practice workspace, enter the expected status and drawing basis for the complete frame calculation. Expected BOM values come from the engineer’s independent calculation.

Read these instructions on any device. Watch or practise a chapter on a desktop or laptop, with a desktop or mobile application layout. Demonstrations use sample data and simulated scanners.

Enter independent FactorySpec answers

  1. Load the current FactorySpec configuration

    Read the current product configuration before changing it.

  2. Choose a complete engineering case

    Work on one full independent case.

  3. Choose the ordinary frame case

    Use the case worked by hand from drawing FA-300.

  4. Read the engineering case

    Read the supplied inputs and the complete independently expected BOM.

  5. Enter the expected native status

    The hand-worked ordinary frame should be valid. Keep the complete expected BOM unchanged.

  6. Record the independent drawing calculation

    State which drawing supplied the independent expected lengths and quantities.

  7. Prepare the complete change

    Check the complete values before preparing the private file.

  8. Upload the checked file

    Upload the complete change. Uploading alone does not save it.

  9. Confirm the complete change

    Confirm that the whole file contains the values you intend to save.

  10. Save the complete change

    Wait for the product to confirm the original save. Separate checking and approval are still required.

Watch or practise this chapter

Saved expected answers remain separate from verification and independent approval.