# Edit the ordered feed selection rule

Inspect the complete approved-source rule and change its priority. Keep the unavailable-source hold and the original mapping intact.

Source: https://help.smartfact.ai/automation/guides/configsheets-feed-policy

Audience: Author

Inspect the complete approved-source rule and change its priority. Keep the unavailable-source hold and the original mapping intact.

## Edit the ordered feed selection rule

1. **Load the original Data configuration**

   Read the selected source and its current revision before preparing a change.

2. **Open the original saved Data revision**

   Select the exact immutable revision retained by its original save. The product rechecks the current source and active head.

3. **Set the source rule priority**

   Retain both the approval condition and the source-ready condition. Set their rule priority to twenty.

4. **Keep the approved mapping profile**

   The first matching rule uses the approved profile. A non-match still holds the feed.

5. **Prepare the complete values**

   Check the complete typed values before preparing their private file.

6. **Upload the complete change**

   Upload privately. Uploading alone does not create the saved revision.

7. **Confirm the supplied values**

   Confirm that the complete file contains the values you intend to save.

8. **Save the original request**

   Wait for the product to confirm this exact save. Do not submit it again if its reply is uncertain.

[Watch or practise this chapter](https://help.smartfact.ai/automation/demo?guide=configsheets-feed-policy&chapter=complete-work&audience=office)

The saved draft still needs independently supplied expected answers, verification and separate review. Active data has not changed.
