# Prove a CheckStation inspection plan

Prepare the complete inspection plan and verify its expected inspection results.

Source: https://help.smartfact.ai/automation/guides/checkstation-proof

Audience: Author

Prepare the complete inspection plan and verify its expected inspection results.

## Prove a CheckStation inspection plan

1. **Load the current CheckStation revision**

   Load the current CheckStation revision

   Read the approved inspection plan, check selections and independent expected inspection results from CheckStation before making a change.

2. **Prepare the complete inspection plan candidate**

   Prepare the complete inspection plan candidate

   Freeze the complete inspection plan and its independently approved expected inspection results together.

3. **Verify every expected inspection result**

   Verify every expected inspection result

   Run CheckStation’ complete check and retain its original proof before requesting a release review.

4. **Assemble the exact inspection plan release**

   Assemble the exact inspection plan release

   Keep the whole verified inspection plan and its independent expected inspection results in one exact release proposal.

5. **Request an independent inspection plan review**

   Request an independent inspection plan review

   Send the complete release to CheckStation for a separate reviewer to check. This does not activate it.

[Watch or practise this chapter](https://help.smartfact.ai/automation/demo?guide=checkstation-proof&chapter=complete-check&audience=office)

The original result stays with CheckStation. A complete release still needs independent approval before production can use it.
