Prove a CheckStation inspection plan
Prepare the complete inspection plan and verify its expected inspection results.
For authors
Prepare the complete inspection plan and verify its expected inspection results.
Read these instructions on any device. Watch or practise a chapter on a desktop or laptop, with a desktop or mobile application layout. Demonstrations use sample data and simulated scanners.
Prove a CheckStation inspection plan
- Load the current CheckStation revision
Load the current CheckStation revision
Read the approved inspection plan, check selections and independent expected inspection results from CheckStation before making a change.
- Prepare the complete inspection plan candidate
Prepare the complete inspection plan candidate
Freeze the complete inspection plan and its independently approved expected inspection results together.
- Verify every expected inspection result
Verify every expected inspection result
Run CheckStation’ complete check and retain its original proof before requesting a release review.
- Assemble the exact inspection plan release
Assemble the exact inspection plan release
Keep the whole verified inspection plan and its independent expected inspection results in one exact release proposal.
- Request an independent inspection plan review
Request an independent inspection plan review
Send the complete release to CheckStation for a separate reviewer to check. This does not activate it.
The original result stays with CheckStation. A complete release still needs independent approval before production can use it.