# Edit CheckStation with manual controls

Require supervisor review for the approved A3 inspection binding.

Source: https://help.smartfact.ai/automation/guides/checkstation-manual-edit

Audience: Author

Require supervisor review for the approved A3 inspection binding.

## Edit CheckStation with manual controls

1. **Load the current CheckStation draft**

   Load the current CheckStation draft

   Read the current draft and its independent examples before editing.

2. **Choose the setting to change**

   Choose the setting to change

   Select change binding a-a3 from the current source choices.

3. **Enter the agreed value**

   Enter the agreed value

   Require supervisor review for the approved A3 inspection binding.

4. **Prepare the complete draft change**

   Prepare the complete draft change

   Prepare the proposed values for this exact source revision. This has not changed the live configuration.

5. **Transfer the prepared change**

   Transfer the prepared change

   Transfer the complete change privately to CheckStation. Transfer alone does not save or approve it.

6. **Confirm the complete change**

   Confirm the complete change

   Check the complete change and confirm that you intend to save it.

7. **Save the draft revision**

   Save the draft revision

   Save the proposed draft. Independent expected results, complete checks and separate review are still required.

[Watch or practise this chapter](https://help.smartfact.ai/automation/demo?guide=checkstation-manual-edit&chapter=complete-task&audience=office)

The new draft is saved. It has not been activated. Enter independent expected results, run the complete checks and obtain a separate review.
