# Review the expected results for newly approved suppliers

Check the expected inspection results for the plan that now holds the newly approved supplier rule, including its bracket width check, before approving them.

Source: https://help.smartfact.ai/automation/guides/checkstation-assisted-case-review

Audience: Reviewer

Check the expected inspection results for the plan that now holds the newly approved supplier rule, including its bracket width check, before approving them.

## Independent check of the expected results

1. **Load the current CheckStation plan**

   Load the current CheckStation plan

   Load the plan that now holds the newly approved supplier rule, with the expected results frozen for it.

2. **Read the expected results**

   Read the expected results

   Read the twelve examples your team supplied for the plan: eight select inspection checks, and four are blocked, each with CheckStation’s reason.

3. **Check the newly approved supplier example**

   Check the newly approved supplier example

   Check example 3: a newly approved supplier on family A with a standard customer expects the hole diameter, visual finish and bracket width checks, with supervisor release. The team wrote these answers before the rule existed.

4. **Explain the independent result check**

   Explain the independent result check

   Record how you checked the newly approved supplier, export and blocked cases against the approved inspection method.

5. **Approve the expected results**

   Approve the expected results

   Save your independent check of these expected results. This does not release the plan or change production.

[Watch or practise this chapter](https://help.smartfact.ai/automation/demo?guide=checkstation-assisted-case-review&chapter=assisted-rule&audience=office)

The independent case review is retained by CheckStation. Nothing has been activated.
