Review the expected results for newly approved suppliers
Check the expected inspection results for the plan that now holds the newly approved supplier rule, including its bracket width check, before approving them.
For reviewers
Check the expected inspection results for the plan that now holds the newly approved supplier rule, including its bracket width check, before approving them.
Read these instructions on any device. Watch or practise a chapter on a desktop or laptop, with a desktop or mobile application layout. Demonstrations use sample data and simulated scanners.
Independent check of the expected results
- Load the current CheckStation plan
Load the current CheckStation plan
Load the plan that now holds the newly approved supplier rule, with the expected results frozen for it.
- Read the expected results
Read the expected results
Read the twelve examples your team supplied for the plan: eight select inspection checks, and four are blocked, each with CheckStation’s reason.
- Check the newly approved supplier example
Check the newly approved supplier example
Check example 3: a newly approved supplier on family A with a standard customer expects the hole diameter, visual finish and bracket width checks, with supervisor release. The team wrote these answers before the rule existed.
- Explain the independent result check
Explain the independent result check
Record how you checked the newly approved supplier, export and blocked cases against the approved inspection method.
- Approve the expected results
Approve the expected results
Save your independent check of these expected results. This does not release the plan or change production.
The independent case review is retained by CheckStation. Nothing has been activated.